Data center commissioning for financial sector tenant of CB Richard Ellis, Richmond, VA
- New 4,000 square foot, $9 million infrastructure addition for a major national bank.
- Data center facility included a 6,000 kW diesel generator, 30,000 gallon fuel system installation with digital controls and N+1 redundancy, specialty exhaust installation and switchgear room air handlers, and a preaction fire protection system.
- Hired to commission the facility, reliatech uncovered multiple issues-including fuel oil system problems that posed a fire hazard and loss of control redundancy, inadequacies in the exhaust system, and programming errors that would prevent backup air handler operation.